New construction and resale are not two versions of the same product. They are two evidence paths. In new construction, the buyer pays toward a result completed over time and must control provider identity, land, project, permits, specifications, schedule, changes, milestones, delivery, warranties and deed. In resale, much of the asset exists and the buyer must verify title, possession, condition, arrears, history, inventory, repairs, releases and handover. The useful question is what remains to be proved on each path.
NOM-247-SE-2021 and the Federal Consumer Protection Law establish information, contract and warranty duties when a transaction falls within their scope. PROFECO summarizes rights concerning the project, price, added costs, permits, specifications, delivery and warranties. These rules do not make every purchase safe or replace the notary, inspection or advice. They provide a concrete baseline for what should be written and when.
This guide avoids invented averages. Price, discount, timing, maintenance and return depend on the asset and contract. Instead of declaring one path superior, it offers a method for comparing two actual options through dates, documents, accountable parties and closing conditions. One buyer may prefer new construction for configuration and warranty; another may prefer resale for visibility and immediate use. Evidence—not the label—should drive the decision.
| Decision | New construction | Resale |
|---|---|---|
| What can be inspected today? | Actual progress, model and visible work | The complete existing asset and systems |
| What still depends on the future? | Completion, changes, delivery and commissioning | Agreed repairs, releases and vacancy |
| What controls payment? | Contract schedule and milestone conditions | Deposit, conditions and balance at closing |
| What defines the product? | Contract, project, plans, specification and exhibits | Title, contract, inventory, condition and exhibits |
| What follows possession? | Warranties, punch list and early operations | Maintenance, assigned warranties and agreed repairs |
| What can fail? | Timing, scope, changes, quality or deed delivery | Title, condition, arrears, inventory or possession |
Open one control sheet per option with columns for statement, document, version, date, accountable party, condition and status. Mark confirmed only when legal, technical and commercial evidence agree. Use pending when a permit, signature, inspection, release or delivery is missing. This discipline prevents a future promise from competing as though it were equal to an observable fact.
Path test: ask what must exist before the next payment, who verifies it, what happens if it is absent and which document proves closure. Apply the same logic to resale: what must be released, repaired, inventoried and delivered before the balance. The comparison becomes fair when both paths disclose their dependencies.
Set the real occupancy date, delay tolerance, rental need, accessibility, furnishing, liquidity and ability to supervise. New construction may require waiting, staged payments and decisions before the final product can be seen. Resale may allow earlier use while requiring acceptance or repair of existing systems. Compare temporary housing, opportunity cost and adaptation work without turning any assumption into an appreciation promise.
Apply this control to each option's file, not to an abstract comparison. For occupancy deadline, record the document, issuer, date and validity; for stage liquidity, identify the event that must occur before more funds are committed. Give tolerance for change an owner and deadline. Keep rental requirement open until independent evidence arrives, and connect supervision capacity to a written consequence: proceed, hold, cure or exit. A third party should be able to review the result without relying on the buyer's memory or the sales narrative.
For new construction, identify the provider, landowner, developer, builder, marketer and people authorized to collect or sign. For resale, verify registered owner, marital status, representation, co-ownership, trust and any attorney-in-fact. A commercial brand does not replace legal identity. Connect each entity to its contract, receiving account, duty and remedy. If money goes to another person, the reason and authority should be written.
Apply this control to each option's file, not to an abstract comparison. For identity and existence, record the document, issuer, date and validity; for owner or landholder, identify the event that must occur before more funds are committed. Give authority to sell an owner and deadline. Keep authorized account open until independent evidence arrives, and connect current representation to a written consequence: proceed, hold, cure or exit. A third party should be able to review the result without relying on the buyer's memory or the sales narrative.
For new construction, request project, plans, specification, area, orientation, parking, storage, common areas, finishes, equipment, services and exclusions. For resale, compare the listing with deed, plans, measurements, inventory, condition and included property. A model does not prove a future view, and a photograph does not prove a furnishing will stay. Every decisive promise should link to a signed, dated contract exhibit.
Apply this control to each option's file, not to an abstract comparison. For plans and area, record the document, issuer, date and validity; for included property, identify the event that must occur before more funds are committed. Give finishes and equipment an owner and deadline. Keep common areas open until independent evidence arrives, and connect exclusions and changes to a written consequence: proceed, hold, cure or exit. A third party should be able to review the result without relying on the buyer's memory or the sales narrative.
A presale requires evidence of land, liens, use, licenses, project and completion path appropriate to the stage. Resale requires title, registry record, liens, taxes, services, condominium regime and restrictions. Do not equate applied-for with issued or in-process with registered. Build an index of document, authority, number, date, scope and validity. The notary coordinates formalization, while the buyer should still understand which condition remains open.
Apply this control to each option's file, not to an abstract comparison. For title and registry, record the document, issuer, date and validity; for liens and releases, identify the event that must occur before more funds are committed. Give applicable licenses an owner and deadline. Keep condominium regime open until independent evidence arrives, and connect document validity to a written consequence: proceed, hold, cure or exit. A third party should be able to review the result without relying on the buyer's memory or the sales narrative.
The contract should identify the property, price, payments, costs, delivery, specifications, warranties, penalties and cancellation under the applicable framework. For new construction add milestones, tolerances, substitutions, changes, extensions, force majeure, completion and deed delivery. For resale add condition, inventory, repairs, fee clearance, vacancy, keys and cost allocation. Evaluate more than a penalty amount: examine trigger, proof, notice, cure period, reciprocity and remedy.
Apply this control to each option's file, not to an abstract comparison. For identified property, record the document, issuer, date and validity; for price and added costs, identify the event that must occur before more funds are committed. Give delivery date and condition an owner and deadline. Keep default and remedy open until independent evidence arrives, and connect signed exhibits to a written consequence: proceed, hold, cure or exit. A third party should be able to review the result without relying on the buyer's memory or the sales narrative.
New-construction schedules may depend on dates or progress. Define what evidence triggers each payment, who certifies it, how discrepancies are reported and what happens when a milestone is missed. In resale, protect deposit and balance through verified instructions, documentary conditions and closing coordination. Never change a beneficiary from a single message. Preserve source of funds, instruction, currency, reference, confirmation and application to price.
Apply this control to each option's file, not to an abstract comparison. For verified beneficiary, record the document, issuer, date and validity; for payment condition, identify the event that must occur before more funds are committed. Give milestone evidence an owner and deadline. Keep receipt and allocation open until independent evidence arrives, and connect change protocol to a written consequence: proceed, hold, cure or exit. A third party should be able to review the result without relying on the buyer's memory or the sales narrative.
“Eighty percent sold” says nothing about construction progress; “eighty percent built” needs a method. Compare plans, schedule, work packages, dated photographs, visits and available technical reports. Observe structure, waterproofing, installations and testing before work is concealed. Record access limits and respect site safety. For resale, replace progress monitoring with a full inspection and repair record. Both paths require physical evidence at different moments.
Apply this control to each option's file, not to an abstract comparison. For baseline schedule, record the document, issuer, date and validity; for observed work package, identify the event that must occur before more funds are committed. Give dated photograph an owner and deadline. Keep technical responsibility open until independent evidence arrives, and connect variance and response to a written consequence: proceed, hold, cure or exit. A third party should be able to review the result without relying on the buyer's memory or the sales narrative.

For new construction, define who may change design, material, equipment, area, common space or date; which equivalence standard applies; how notice works; and which buyer right follows. In resale, document repairs, removed furnishings or alteration between offer and handover. “Similar” requires comparable characteristics. Keep a register of request, impact, approval, cost, timing and updated drawing. A conversation should not silently amend a signed exhibit.
Apply this control to each option's file, not to an abstract comparison. For original description, record the document, issuer, date and validity; for proposed change, identify the event that must occur before more funds are committed. Give technical equivalence an owner and deadline. Keep written approval open until independent evidence arrives, and connect cost and timing effect to a written consequence: proceed, hold, cure or exit. A third party should be able to review the result without relying on the buyer's memory or the sales narrative.
New construction benefits from stage inspections when permitted, followed by pre-delivery review and reinspection of punch-list items. Resale needs system diagnosis covering moisture, installations, equipment, envelope and relevant common property. In both, the scope should identify what was tested, what was inaccessible, which measurements were used and who corrects findings. A finish list does not replace functional testing. Prioritize safety, water, structure and habitability before cosmetics.
Apply this control to each option's file, not to an abstract comparison. For scope and limitations, record the document, issuer, date and validity; for functional tests, identify the event that must occur before more funds are committed. Give prioritized findings an owner and deadline. Keep correction responsibility open until independent evidence arrives, and connect reinspection to a written consequence: proceed, hold, cure or exit. A third party should be able to review the result without relying on the buyer's memory or the sales narrative.
Actual delivery is more than receiving keys. For new construction, prepare a signed record, punch list, meters, manuals, warranties, controls, inventory, operating common areas and possession date. For resale, reconcile keys, remotes, included items, readings, services, fee clearance, vacancy, repairs and final condition. Photograph the state and record exceptions. Distinguishing physical delivery, deed signing and registration prevents an ambiguous date from transferring risk unexpectedly.
Apply this control to each option's file, not to an abstract comparison. For signed delivery record, record the document, issuer, date and validity; for keys and access, identify the event that must occur before more funds are committed. Give meter readings an owner and deadline. Keep manuals and inventory open until independent evidence arrives, and connect dated punch list to a written consequence: proceed, hold, cure or exit. A third party should be able to review the result without relying on the buyer's memory or the sales narrative.

For transactions within their scope, NOM-247 and the LFPC provide minimum periods of five years for structural matters, three for waterproofing and one for other elements, counted from actual delivery. Confirm the responsible provider, coverage, exclusions, notice, access, expert review and claim address. In resale, determine which warranties remain, may be assigned or have expired, plus obligations agreed with the seller. Preserve required maintenance to protect contractual rights.
Apply this control to each option's file, not to an abstract comparison. For actual delivery date, record the document, issuer, date and validity; for period by component, identify the event that must occur before more funds are committed. Give notice procedure an owner and deadline. Keep required maintenance open until independent evidence arrives, and connect repair evidence to a written consequence: proceed, hold, cure or exit. A third party should be able to review the result without relying on the buyer's memory or the sales narrative.
A new unit may be delivered before all common systems mature; a resale unit may enter a community with years of budgets, reserves and projects. For both, review constitutive deed, rules, budget, fees, reserve, delinquency, policies, contracts, minutes and work. In new construction, understand transition from developer control to owners. In resale, request fee clearance and recent decisions. The private unit cannot be separated from the building’s operations.
Apply this control to each option's file, not to an abstract comparison. For regime and rules, record the document, issuer, date and validity; for budget and fee, identify the event that must occur before more funds are committed. Give reserve fund an owner and deadline. Keep delinquency and projects open until independent evidence arrives, and connect transition or clearance to a written consequence: proceed, hold, cure or exit. A third party should be able to review the result without relying on the buyer's memory or the sales narrative.
Closing should connect identity, title, liens, price, taxes, any trust, deed, possession and registration. In new construction, confirm completion and documents needed to deed the promised unit. In resale, confirm release of the current owner’s liens and arrears. Define who holds funds and which documents must exist before disbursement. Possession without formalization and a deed without controlled delivery are different states that require separate management.
Apply this control to each option's file, not to an abstract comparison. For draft deed, record the document, issuer, date and validity; for releases, identify the event that must occur before more funds are committed. Give calculation and funds an owner and deadline. Keep signature and delivery open until independent evidence arrives, and connect registry follow-up to a written consequence: proceed, hold, cure or exit. A third party should be able to review the result without relying on the buyer's memory or the sales narrative.
Build a matrix covering occupancy date, available evidence, open conditions, supervision capacity, reserve, flexibility, warranty, physical state, condominium and exit. Weight each criterion and cite its source. New construction may win on configuration and warranty while losing on time and future dependency. Resale may win on visibility and location while losing on repair or history. Convert every gap that changes the result into a condition, not an expectation.
Apply this control to each option's file, not to an abstract comparison. For weighted criteria, record the document, issuer, date and validity; for source for each score, identify the event that must occur before more funds are committed. Give material gaps an owner and deadline. Keep conditions precedent open until independent evidence arrives, and connect owner and date to a written consequence: proceed, hold, cure or exit. A third party should be able to review the result without relying on the buyer's memory or the sales narrative.
When a transaction falls within NOM-247 and LFPC scope, minimum periods apply. Still verify who answers, when coverage begins, which component is covered and how to claim.
It may retain assignable warranties or include negotiated seller duties, but do not assume either. Review documents, validity, assignment, seller and condition.
Only when the contract defines the milestone, evidence, verifier and remedy. An unexplained percentage does not protect the buyer.
Only after normalizing area, parking, storage, condition, equipment, date, added costs, taxes and open obligations.
Documented physical possession under the contract. Distinguish it from signing, deed formalization and registration even when coordinated.
Neither by label. The more defensible path verifies identity, title, contract, evidence, inspection, funds, delivery and remedies.
Riviera Collection can help organize questions, visits, exhibits, milestones, inspections and conditions so you can compare new construction and resale without mistaking a presentation for evidence.
An advisor replies within 24 hours.
\n